95%
Fewer patrol rounds
55,000 m² plant: +20 min production per day after milk-run orchestration.
Industry · Home appliances
Output targets and labour shortage meet patrolling drivers. twinzo shows the waste, then orchestrates on-demand moves.
95%
Fewer patrol rounds · 55,000 m² plant
+20 min
Production recovered per day · same plant
20→2
Logistics idle minutes per day · whitepaper case
Drivers stop circling the hall and move on demand, so trucks go where material is waiting.
Lower average speed in the aisles at the same performance.
One live picture of fleet, idle time and routes across halls.
95%
55,000 m² plant: +20 min production per day after milk-run orchestration.
−60%
15 → 6 km/h at the same performance — safer aisles, same output.
20→2 min
34 → 27 forklifts in six months on the whitepaper case.
Want this benchmark for your plant? Bring your fleet size and layout — we bring the numbers.
Book a 30-min fleet assessment30 minutes on your fleet, layout and RTLS. We agree what to measure.
A live twin of part of your site, built on real positions.
Review utilisation, idle time and routes, then decide on rollout — or stop.
twinzo sits beside SAP, MES and WMS. It does not replace them.
Deployment
twinzo cloud · on-prem · hybrid · offline
Security
ISO 27001 / 27017
Integrations
SAP · MES · WMS · OPC-UA · REST API
Hardware
RTLS-agnostic — no tag lock-in